Vennu Dhananjay
About Candidate
Having 10+yrs. Experience in Metro Station/tunnel, Commercial &High-rise Buildings for Installation, Testing , Start-up & Commissioning projects, Systems/Equipment, LV Switchgear, MCC, Motors, LT Cables, Distribution Board, Lighting, Socket, UPS System, Annunciator panels, Fibre Optic, Network System, Building Automation System, Fire Alarm System, Bus Ducts and. Demonstrated background and through Knowledge of International Standards and Codes such as NEC, NFPA, NEMA, NETA, BS, IEEE, IEC,SAUDI ARAMCO.
Education
Experiences
Review Drawings, documents for Design Engineering Project. Estimating the quantity from drawing and prepare bill of quantity. To follow the project specification and Prepare Material Approvals, submittals as per approved drawings issued for construction. Installation of cabling, conduits, grounding, lighting, cable tray trunking, DB installation, Duct bank installation, Fire alarm panel, DDC Panels for BMS system, Patch panels for CCTV system and all kinds of electrical system for compliance of specifications and work procedures. Installation of Grounding system for Electrical, instrumentation and Telecommunication carried out separately as per Aramco Standards and also lightning protection system. Monitor the installation and pre-commissioning process of the contractor by carrying regular inspections. Reviewed the various construction drawings and specification for the project. To handle foremen, Supervisor and Electricians and monitor day to day activity. Give them Daily task for work. Coordinating with other subcontractors and Honeywell for BMS and CCTV. Follow procurement department for material to be purchase and deliver in time. Update all site activity to construction manager and project manager weekly and monthly basis. Raise Technical quarries for any engineering and design activity or variations as per approved drawing. To raise inspection and invite QC for final inspection. Rectifying the comments given by PID. Co-Ordinate with civil, mechanical engineers for completion of electrical work. Attend weekly construction meeting along with safety and quality to sort out the problems in sight. Getting work permit from maintenance team for live panel’s termination and closing after work completion.
Supervision for works activities at site as per approved drawing &approved materials. Installation of Cable tray, cable ladder, cable laying, cable gland installation & cable termination. Installation of PVC conduit, G.I Conduit, Earthing, earth rods, safety earth & instrument earthing Installation of Motor control centre, Main switch board, MLTB, Distribution Board, Switch gear panel, control panels, bus duct, etc. Testing of electrical equipment MCC, Switch gear, transformer, panels, motors, and cables & earthing system. Well familiar with installation, Inspection, Pre-Commissioning, Commissioning and startup of Electrical and Mechanical works through BMS system. Ability to train and monitor construction Team using variety of tools and techniques. Reviewing Method Statements for the Works. High proficiency in using and interpreting International Technical Standards and Codes of Practice and an ability to rapidly acquire knowledge about those.
• Installation and maintenance of steam generators about 5kw to 24kw power • Installation and maintenance of Face steamer, Head steamer etc. • Providing PVC Trunking, wiring and gland installation for steam generators. • CCTV, Lighting, Small Power wiring and devices installation • Organizing meeting with Consultants and Suppliers for Special System installation. • Coordination with other services for proper installation. • Coordination with Consultants and Clients for Inspection and Approval. • Check all materials have been delivered to site and all the material inspection reports have been completed. • Ensure the control of the wastage of material at site. • Ensure quality and safety.