MOHAMED RISWANUDEEN
About Candidate
Practical Site Work Experience in Testing &Commissioning High Voltage, AMI Meter , Low voltage Cable Installation, Relay Control Panel Scheme RMU, Transformer Motor Switch Gear Control Interlocks
Education
Experiences
Advanced metering Infrastructure (AMI )Installed Gateway,junction box ,Enclosure Electrical Meter Configuration Electrical Meter Looping and Water meter termination Cable Termination DLMS(RS485 ) and MBus meter. Analyze /troubleshoot faults related to meter Communication Equipment and system and work for Timely resolution of any abnormalities to ensure Availability of Entire infrastructure. Responsible of installation & commissioning of Advanced metering Infrastructure Equipment and System such meter,communication gateway head end system And Analytic system Send Daily and monthly report Data Analysis and final Summaries for each site work. Verify network Connectivity Status and report Abnormalities to network Team Electric meter Actaris,ELS(ABB),ISKRA,ELSTER,KRONHE,SIEMENS all Meter Configuration
Maintained Air circuit breaker, vacuum circuit breaker, Gas circuit breaker, Oil circuit breaker. Maintained Power Transformer, Distribution Transformer, Starter motor Transformer, Unit Transformer, dry type Transformer and harmonic filter. Transformer pushing replacement. Monitored the meters by always keeping it clean with brushes and sandpaper Repairs the faulty meter by changing the relays and the incorrect wiring. Installed various meters and related equipment such as circuit breakers. Installed Power Quality Meter,IPL144 Energy Meter. Installed Ammeter, Volt Meter,Var Meter,watt meter and Power Factor Meter Inspected the various electric meters and relays for any inaccuracy in function. High Voltage and medium voltage cable testing. HV cable continuity testing phasing. Insulation Resistance testing. Maintained records of the meter reading and installation procedure the record of various work. Preventive maintenance of 11kv RMU, Transformer, motor, ups Battery Charger. Inspection of control and relay panel preparation of test Report and cable schedule Monitored all equipment present in work area and ensured that it was maintained properly. Maintained log books and prepared reports of all maintenance/repairs carried. , Supervises and assigns the work of maintenance employees and Inspects work. Provided technical support to the team members and resolved all problems.
132KV/ 33KV/ 11KV/ 6.6KV gas Insulated switchgear panels & Air Insulated switch Gears testing and commissioning Cable DEWA OHL Installed of 11kv OverHead lines woodpole and Desmantling And Recovery of Existing 33kv,11kv Ovehead lines. Prepared Drawing,Demarcation And BOQ. Cable installation laying and commissioning of 11kv cable Maintained Transformer, RMU, and circuit breakers Installation Energy meter, IPL Meter and Power Quality Meter. Maintained UPS, Battery And Battery Charger. Site supervision of all activities (excavation, troughs cover laying, cable laying, back filling, reinstatement. Instruct Senior Engineer the daily activities and follow-up Materials also arrangements and daily report writing. High Voltage and Medium Voltage cable testing. 11kv Cable continuity test (Phasing)and VLF Testing Testing and commissioning 11kv Cable laying, jointing, pulling and interlocking. Monitored all equipment present in work area and ensured that it was maintained.