MUHAMMED SINAN K
About Candidate
Professional with a background of Mechanical engineering (B Tech), having 7 years of experience in Quality Assurance and Quality Control Department in Structural&Piping Engineering projects .
Education
Experiences
WELDING Coordinating all the QC related activities with Client. Perform Stage-wise Inspection to Final Inspection to ensure compliance to Drawings, Procedures, Codes & Standards. Verification of Incoming material and review of Mill Test Certicates. Witnessing Lab Test – Mechanical Test(Tensile & Charpy Impact) & Chemical Analysis Carryout day today jobsurveillance and inspection activities as per approved QCPs, ITPsand project producers. Raw material inspection as per applicable code and standard. Prepare Prequalification Documents. Prepare Material Approval Request. Ensure welding is carried out according to the approved WPS Witnessing in process NDT techniques of welds, MPI, DPT. Witnessing vaccum box test,oil leak test & water leak test. Submission QC Dossier / Manufacturing Record Book. PAINTING Receiving Inspection of Paint Materials & Abrasives. Blasting Inspection ( Salt Contamination ,Anchor Profile , Dust level). DFT Checking (Primer Coat, Mid Coat , Finish Coat Inspection) using DFT Gauge. Maintaining the Daily Weather Monitoring Report. Hot Dip Galvanizing Inspection as per relevant Standard. Ensure timely calibration of measuring instruments ( DFT Gauge,Salt Contamination Meter,Surface Profile Gauge,Dew Point Meter,Digital Indoor-Outdoor thermometer. Witnessing Holiday test. Witnessing paint PQT ( Pull-Off Adhesion Test). Submitting Painting Procedure to Client. PROJECT EXPERIENCE ADNOC PROJECTS Call-out Contract for ASR Gas Tie-ins in Asab (Packege B). Construction of Flow lines and Well head Tie-ins installation works ADCO Field Package- B (BAB). EPC-Works-Modification and strengthening of Habshan piperacks phase -3. EPC for ASAB Phase II stage -1 project –Diesel Day Tank. Call- out contract for Buhasa well head remote monitoring & control implementation & construction of Oil Network over Pressure protection – long term EPC for Call out works Contract for ASR Gas facilities in BAB Package-A.
Ensure welding activities are carried out according to approved WPS. Receiving inspection for incoming Materials & review of Material Certificates to check compliance to Project Specifications. witnessing Welder Qualification Test. Inspection of Bevel Preparation,Root Gap,Root Face. Ensure the preheating of the joints according to the specified WPS. Visual Inspection after the Welding. Inspection of Welding Consumables complying with the approved welding procedures. Follow up the Construction Drawing , prepare and maintain the Inspection Records. Confirm repairs,re-testing and re-inspection in accordance with Specifications. Ensure that all works are performed as per the requirements of the approved Quality Control plan. To witness the hydrotest