Site Engineer

MOHAMED RISWANUDEEN

Dubai
$3000
Connect
Shortlist

About Candidate

Practical Site Work Experience in Testing &Commissioning High Voltage, AMI Meter , Low voltage Cable Installation, Relay Control Panel Scheme RMU, Transformer Motor Switch Gear Control Interlocks

Education

B
Bachelor of Electrical & Electronics Engineering 2009-01-15
Anna University

Experiences

S
Site Engineer 2021-01-15 - 2022-01-15
ADDC AMI Project

 Advanced metering Infrastructure (AMI )Installed Gateway,junction box ,Enclosure Electrical Meter Configuration  Electrical Meter Looping and Water meter termination  Cable Termination DLMS(RS485 ) and MBus meter.  Analyze /troubleshoot faults related to meter Communication Equipment and system and work for Timely resolution of any abnormalities to ensure Availability of Entire infrastructure.  Responsible of installation & commissioning of Advanced metering Infrastructure Equipment and System such meter,communication gateway head end system And Analytic system  Send Daily and monthly report Data Analysis and final Summaries for each site work.  Verify network Connectivity Status and report Abnormalities to network Team  Electric meter Actaris,ELS(ABB),ISKRA,ELSTER,KRONHE,SIEMENS all Meter Configuration

S
Site Engineer 2015-04-15 - 2020-05-15
Emirates Global Aluminum

 Maintained Air circuit breaker, vacuum circuit breaker, Gas circuit breaker, Oil circuit breaker.  Maintained Power Transformer, Distribution Transformer, Starter motor Transformer, Unit Transformer, dry type Transformer and harmonic filter.  Transformer pushing replacement.  Monitored the meters by always keeping it clean with brushes and sandpaper  Repairs the faulty meter by changing the relays and the incorrect wiring.  Installed various meters and related equipment such as circuit breakers.  Installed Power Quality Meter,IPL144 Energy Meter.  Installed Ammeter, Volt Meter,Var Meter,watt meter and Power Factor Meter  Inspected the various electric meters and relays for any inaccuracy in function.  High Voltage and medium voltage cable testing.  HV cable continuity testing phasing.  Insulation Resistance testing.  Maintained records of the meter reading and installation procedure the record of various work.  Preventive maintenance of 11kv RMU, Transformer, motor, ups Battery Charger.  Inspection of control and relay panel preparation of test Report and cable schedule  Monitored all equipment present in work area and ensured that it was maintained properly.  Maintained log books and prepared reports of all maintenance/repairs carried. ,  Supervises and assigns the work of maintenance employees and Inspects work.  Provided technical support to the team members and resolved all problems.

S
Site Engineer 2013-01-15 - 2014-12-15
EPS Infrastructure limited India

 132KV/ 33KV/ 11KV/ 6.6KV gas Insulated switchgear panels & Air Insulated switch Gears testing and commissioning Cable  DEWA OHL Installed of 11kv OverHead lines woodpole and Desmantling And Recovery of Existing 33kv,11kv Ovehead lines.  Prepared Drawing,Demarcation And BOQ.  Cable installation laying and commissioning of 11kv cable  Maintained Transformer, RMU, and circuit breakers  Installation Energy meter, IPL Meter and Power Quality Meter.  Maintained UPS, Battery And Battery Charger.  Site supervision of all activities (excavation, troughs cover laying, cable laying, back filling, reinstatement.  Instruct Senior Engineer the daily activities and follow-up  Materials also arrangements and daily report writing.  High Voltage and Medium Voltage cable testing.  11kv Cable continuity test (Phasing)and VLF Testing Testing and commissioning 11kv Cable laying, jointing, pulling and interlocking.  Monitored all equipment present in work area and ensured that it was maintained.

Skills

Site Inspection
80%
Engineering
80%
Communication
80%

Be the first to review “MOHAMED RISWANUDEEN”