We closed the month of April on a high note with the successful turnover of a ready-built Factory renovation project located in Laguna Technopark, Biñan, Laguna. This project marks a significant milestone, transforming two existing warehouses into a fully integrated production facility built to meet standard regulations. At the center of this transformation was cutting-edge engineering and flawless execution, with a new steel structure constructed within the existing footprint. Beyond the technical achievement, the project delivered excellence across these key performance areas: safety, efficiency, quality, delivery and cost (SEQDC) management a well-rounded success by all measures. A big thank you to the incredible project team whose dedication, collaboration, and hard work were key to delivering this project successfully.
We closed the month of April on a high note with the successful turnover of a ready-built Factory renovation project located in Laguna Technopark, Biñan, Laguna. This project marks a significant milestone, transforming two existing warehouses into a fully integrated production facility built to meet standard regulations. At the center of this transformation was cutting-edge engineering and flawless execution, with a new steel structure constructed within the existing footprint. Beyond the technical achievement, the project delivered excellence across these key performance areas: safety, efficiency, quality, delivery and cost (SEQDC) management a well-rounded success by all measures. A big thank you to the incredible project team whose dedication, collaboration, and hard work were key to delivering this project successfully.