
MILTON JOSEPH
About Candidate
CAREER HIGHLIGHTS
– Graduate Mechanical Engineer with more than 8 years of experience.
– Good exposure in the field of Metal fabrication, Installation and related Chemical Cleaning services.
– Well rounded interpersonal skills and experience in dealing courteously and effectively with senior officials.
– Willingness to quick learn and implement.
Education
Experiences
· Identifying and exploring business opportunities with new and existing customers · Accurately assessing a customer’s needs and requirements. · Preparation of QA/QC documents (MS, ITP etc..) as per codes and standards. · Job planning, scheduling as per client requirements. · Execution Monitoring and implementing corrective actions if required. · Final inspection and Preparation of Test reports. · Managing, Maintaining and Developing the relationship with the customers Major Completed projects: · Westcoast Project:- Air Liquide Middle East Manufacturing RMC FZC-RAK. (chemical cleaning and phosphating of CS pipe spools for skid packages). · EPC For Replacement Of Firewater Pumps At Jebel Dhanna.- Adnoc offshore. (Pickling and passivation of SS and Duplex pipe spools by dipping method.) · Port Allen project:- Air Liquide Middle East Manufacturing RMC FZC-RAK. (chemical cleaning and phosphating of CS pipe spools for skid packages) · Geismar Project:- Air Liquide Middle East Manufacturing RMC FZC-RAK. (chemical cleaning and phosphating of CS pipe spools for skid packages) · Sea World – Back of House:- Grankraft Industries –Sharjah. (Passivation of fabricated SS panels :- Abudhabi) · AZERI CENTRAL EAST DPQ PLTF:-SUEZ Oil & Gas systems (Pickling and passivation of Duplex pipelines and vessels by local application method) · Hydrocylone Package For Musallim Third Module And ILS Replacement-PDO Oman. (Pickling and passivation of Duplex vessels by local application method).
· Job inspection and estimation. · Preparation of Engineering Drawings and shop drawings as per client requirements. · Preparation of quality documents as per client requirements. · Planning and scheduling daily works and assign to supervisors and keeping records. · Execution Monitoring and implementing corrective actions if required. · Testing, commissioning and job handover. · Managing, Maintaining and Developing the relationship with the customers Major Completed projects: · 400KW Steam Turbine Unit Installation which includes equipments installation, fabrication and erection of pipelines, equipments and steel structure:- Falcon Chemicals- Jabel Ali. · Project JAMBO:- Fosroc International-Kenya. (Design, Engineering, Manufacturing, testing and Commissioning of Admixture Plant, Capacity :- 25 MLPA) · Project OPTIMUS:- Fosroc International-Jeddah-Saudi Arabia.. (Design, Engineering, Manufacturing, testing and Commissioning of Powder Plant, Capacity:- 50,000 TPA – Raw material storage , transport, Mixing, Product transport, packing and palletizing.) · Project RAMP:- Al Gurg Fosroc LLC, Dubai-UAE (Design, Engineering, Manufacturing, testing and Commissioning of Powder Plant, Capacity:- 50,000 TPA – Raw material storage , transport, Mixing, Product transport, packing and palletizing.) · Falcon Chemicals- Jabel Ali. o Utility Piping system for New Plastic Factory and installation of Chiller Unit, Cooling Tower, Air compressor and associated pipe line works. o Engineering Manufacture, Erection and Commissioning of Stainless Steel Agitating reactors for adhesive plant & latex plant and associated pipe lines. · Hazel Petro Chemicals- Hamriyah Free Zone-Sharjah. Fabrication and Erection of Process Pipeline &Fire water Pipeline. · Marstone Cement Works:- Umm Al Quwain. Design, Fabrication, Installation and commissioning of Screw conveyor type raw material mixing system.