± 15 years of experience in EPCC phase of large project and implementation, operation as well as commissioning
and startup of instrumentation and control systems as well as safety-instrumented systems in oil and gas
industry.
Currently I’m Head service Planning and Methods division maintenance in BERKINE Groupement El Merk Field
Sonatrach and oxy partenariat.
I started my career as an IE&C engineer supervisor and I’m senior instrument engineer and more I he’d the
position instrument & electrical supervisor in the technical department for the new work and new project at
Ourhoud Groupement Sonatrach and CEPCA partenariat.
Develop specification and prepare material requisitions for control and safety systems, instruments, valves and
all other instruments on assigned front end and detailed engineering projects
Carry out instrument sizing calculations and verification checks
Review and develop P&IDs for correctness in respect of control & safety requirements and instrumentation
Prepare a project instrument index in accordance with the P&IDs
Assist the designers with the preparation of cable block diagrams, cable routing, equipment layouts, termination
drawings and schedules
Review all C&I drawings and ensure that the quality of design and drawings produced for enquiry and fabrication
purposes is of satisfactory standard
Prepare technical bid analysis for C&I equipment
Attend coordination meetings and engineering review meetings with supplier as required
Review document requirements and issue dates for major equipment with suppliers and assist Technical
Department in compiling a Supplier’s Document Index
Assist Technical Department with the expediting of supplier documents
Review and approve supplier documents for instrumentation and distribute
Attend site surveys and contribute to site survey reports
Give support to client, project engineers, other specialist engineers and inspectors on C&I engineering matters.
Review C&I aspects of package unit supplier’s drawings as requested by the engineer responsible for the
equipment
Advise the Lead C&I Engineer of any slippages and their causes and proposed corrective action
Advise the Lead C&I Engineer of any technical problems and unresolved differences with other groups
Assist the Lead C&I Engineer with the progress reports
Education
Experiences
Reviewed current project statuses Ensure the development and revision of maintenance plans for the company’s equipment and installation in collaboration with the structures concerned. Participate in the development of technical bids (maintenance portion), in response to tenders Develops the company’s maintenance standards (renovation-certification and preventive maintenance) and ensures their implementation, updating and strict application. Prepare the investment specifications (specific specifications) for the ELM workshops. Ensure the implementation of techno-economic studies relating to the maintenance of oil equipment. Manage petroleum maintenance documentation (drawings, plans, certificates, operating procedures, ct) Define and develop oil maintenance procedures and procedures. Develop and monitor oil maintenance contracts. Pick list approvals, TBE Reviews, Material final check PM review with MNT/EP/EXP meeting, Musis Cleanup review with MNT, Working Musis Cleanup Updating MNT contracts Participated in a meeting with Inspection and reviewing with Head Dept Participated in meeting with WO/PM review with MNT and contract support Shutdown Planning Worklist for ALL Equipment Review SOW for SD2025
Develop specification & data sheets; prepare material requisitions and orders for control and safety systems, instruments, valves and all other instruments on assigned front end. Detailed engineering projects of instrument drawing like Cable schedule, JB wiring, Loop Drawings and layouts, wiring & loop & functional logic diagrams, P&ID. HAZOP study, safety logic diagram - Input output assignment list, ICS data base Create scopes of work for new project. Ensure Instrument and Control (I&C) engineering activities are conducted in accordance with Regulatory requirements, project specifications and approved variations if any. liaise, coordinate, interface and collaborate with the other disciplines (process, engineering, quality, HSE, interface, etc.) within the EPCC package PMT to adequately manage the interfaces with the other disciplines, seeking expert advice from the PMT EPCC package external entities like Engineering Core Team or Shareholders where additional expertise is required. Liaise, coordinate, support, interface and collaborate with the other PMT Entities as necessary, Study manager and supervisor for the instrumentation & telecom part of the EPC project (creation of a controlled landfill at the Ourhoud field). Technical evaluation of offers for the purchase of equipment as well as preliminary study offers for new projects. Resolve engineering issues that may arise and communicate with the Project Execution Team. Elevate issues to higher levels when necessary. Develop, update, and amend various policies and procedures related to Projects Management department in consultation with the Head of Projects Engineering Support and other team members. support the issue of the as-built technical documentation and deliverables, carry out site activities during the project execution to support the design and engineering of the equipment and facilities, Participates in regularly scheduled construction & Commissioning progress meetings. Supervision of Site Activities such as erection, installation, testing and commissioning. Approval and supervision of defined tests procedures, start-up sequences, reliability test runs and performance tests. Example of project: Project connection of WAG ( water and gas injection ) wells: - Study and procurement manager for the instrumentation & telecom part for the construction and commissioning project of the new WAG wells. - Technical evaluation of offers for the purchase of materials as well as offers EPCC Project CO2 & powder firefighting system for electrical substations : - manager and responsible for the instrumentation part within the framework of the EPC project CO2 firefighting system & powder for electrical substations - Responsible for the commissioning and closing of the CO2 & powder firefighting system project for the electrical substations. Project Infill drilling ( connection of OP wells ) in Ourhoud field : - Study and procurement manager for the instrumentation & telecom part for the construction and commissioning project of the new OP (oil production) wells. - Technical evaluation of offers for the purchase of materials as well as offers.
Prepare permit to Work and coordinate with contractor. Supervise all Assembly and welding of supports for cable routing (MV, LV & control) . Installing of MV, LV & control cable trays. Supervise Installation the new PDC & DC panels and connexion &Modification the racks MV, LV, I/E existents. Installation of FCS, SCS ESD, SCS F&G ( YOKOGAWA) panels and UCP panel for new Motor Recompressor and new Turbo Compresso. Support team of Modification DCS, ESD and F&G existents. Supervise the maintenance and welding of junction box cables MV and LV. Supervise the work of connection and continuity test and isolation LV and MV cables and instruments. Preparation Instruments Location Layout, Instruments Logic Diagram, single line diagrams SLD, Cable Trench Layout, Cable Schedule, Loop Diagram, Wiring Diagram, instrument cable termination drawing (ICTD) for Junction box (JB) & Cabinet, Electrical and Pneumatic hookups. Support the engineering team of external organizations and entity appointed representatives to ensure engineering design addresses each companies' expectations consistent with Sonatrach OURHOUD and Project objectives. Uphold all Project philosophies and procedures and ensure that these are applied to the specification,design, and procurement of l&C items. Supervise all construction (Test and Precommissioning /commissioning) for Installing a new processing unit consists of: - 1 degasser with oil transfer pumps. - 3 Fine filter with retro-washing by using LP gas fuel. - 1 plate separator CPI (water, oil and mud) with gas blenketing fitted with oil transfer pumps. - 4 TANK, T1 (24.38mx10.97 / 4178 m3), T2 (12.19 x 10.97 / 672 m3) T3 (9.14mx12.8m / 672 m3). Installation of a new sludge treatment unit. Installing a new package injection of chemicals. Installing pumps PA01A / B / C, PA03A / B, PA04A / B, PA05A / B and PA06A / B. Supervise all construction (Test and Precommissioning /commissioning) of GAS RECOMPRESSOR CENTRIFUGE BCL 454 Nuovo Pignone and auxiliary. Supervise all construction (Test and Precommissioning /commissioning) of GAS TURBO COMPRESSOR Nuovo Pignone and auxiliary. Instrument calibration (YOKOGAWA, ROSEMOUNT, FISHER) Fire & Gas system's Installation. Supervises the installation of pneumatic instruments.
Create scopes of work for new project. Technical evaluation of offers for the purchase of equipment as well as preliminary study offers for new projects. Detailed engineering projects of instrument drawing like Cable schedule, JB wiring, Loop Drawings and layouts, wiring & loop & functional logic diagrams, P&ID. Develop specification & data sheets; prepare material requisitions and orders for control and safety systems, instruments, valves and all other instruments on assigned front end. Develop specification and prepare material requisitions for control and safety systems, instruments, valves and all other instruments on assigned front end and detailed engineering projects Carry out instrument sizing calculations and verification checks Review and develop P&IDs for correctness in respect of control & safety requirements and instrumentation Prepare a project instrument index in accordance with the P&IDs Ensure Instrument and Control (I&C) engineering activities are conducted in accordance with Regulatory requirements, project specifications and approved variations if any. Supervises the installation of pneumatic instruments Participation in Factory Acceptance Test (FAT) and Site Acceptance Tests (SAT) of instrumentation/control packages, e.g. WCP( wellhead control panel ) of OP & WAG wells , Nitrogen Unit AIRPACK, UCP extinguishing system agent HFC-227ea (FM-200) , CO2 firefighting system & powder. Project engineer and supervise all construction, precommissionning/commissioning of: - Warehouse sprinkler system project in the ourhoud field - Nitrogen Unit AIRPACK - Anti-Fire System in electrical substation - Fire protection system with the extinguishing agent HFC-227ea (FM-200) at server rooms and buildings archive the organization Ourhoud field - Project manager and responsible for the instrumentation part of the EPC project CO2 firefighting system & powder for electrical substations. - Responsible for the commissioning and closing of the CO2 & powder fire protection system project for the electrical substations.
Supervise all construction (Test and Precommissioning /commissioning) for connection of OP wells project Prepare permit to Work and coordinate with contractor Supervise the maintenance and welding of junction box cables MV and LV and the work of connection and continuity test and isolation . Installation of control valves & SDV, ESDV and instruments like level, flow, pressure, temperature switched, gauges. Preparation of construction file (test and commissioning, precommissioning) wells production oil OP and wells injection water and gas WAG. Controlled all activity related to the optical fiber (test and welding, setup). Controlled all activity related to the Control room panel installation and cable termination. Supervise in performing calibration of process instruments and modifying control loops, remove. Replace instruments like transmitters, gauges, switches, RTD & TC, positioners etc. Support the engineering team of external organizations and entity appointed representatives to ensure engineering design addresses each companies' expectations consistent with Sonatrach OURHOUD and Project objectives.