
Furqan Ali Khan
About Candidate
• Quality-oriented professional with more than 6 years of experience in construction and maintenance of different projects in India and Gulf.
• Experience of working with multi-national and multi-cultural project teams, ability to work and coordinate with other departments.
Education
-
Experiences
Worked as an engineer in the Gulf Engineering company from July 2022 – October 2023 for their project in Farwaniya Hospital, Kuwait • Perform inspections of electrical systems and equipment to ensure compliance with codes and regulations. • Review electrical plans and specifications to verify accuracy and compliance. • Conduct tests and measurements to assess the performance and safety of electrical installations. • Identify and document any deficiencies or violations and provide recommendations for corrective action. • Collaborate with project managers and contractors to resolve any issues or concerns related to electrical installations. • Stay current with industry standards and regulations to ensure ongoing compliance. • Provide guidance and support to other team members on electrical code requirements and best practices. • Prepare detailed reports and documentation of inspection findings. • Attend meetings and participate in discussions related to electrical projects and inspections. • Coordinate with other engineering disciplines to ensure integration of electrical systems into the overall project design. • Monitor contractor and subcontractor performance during installation and commissioning to ensure adherence to specifications and quality standards. • Support Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for electrical systems and equipment. • Address technical queries (TQ) and ensure approved changes are incorporated into electrical designs. • Conduct site visits and inspections to verify electrical installations align with approved designs and safety standards. • Prepare technical reports, progress updates, and documentation for project stakeholders. • Ensure compliance with HSE standards in all electrical engineering activities. • Maintain accurate records of inspections and related documentation.
Worked in MACC for their project in King Abdullah University of science and technology. As Engineer, below mentioned Job activities performed: • Supports the development and administration of an Engagement Plan that anticipates required Company reviews, resolves known uncertainties and allows for additional resources to address unanticipated uncertainties • Administers Key Issues and Project Issues for assigned work scope • Oversees Engineering, Procurement and Construction Surveillance Plans • Assists with the administration of Third-Party Verification Program • Coordinate’s specification deviations that require Subject Matter Expert review and input • Serves as interface between Project Team and Contractor • Coordinates and facilitates meetings to resolve issues and enable Contractor to deliver in accordance with the Contract • Administers and enforces Contract Requirements and Coordination Procedures • Approvals for Changes (MOC’s) for designated project component ensures the implementation of the Change • Ensures smooth transitions between Project stages (Engineering/Procurement to Fabrication to Installation/Construction and Commissioning) • Heavily involved in interface and coordinating interfaces between components and stages and with other sites for specific area of responsibility • Leads problem solving activities across Project sites • Ensures coordination of external interfaces with other contractors • Assists with handover planning from Project to Operations
Duties and Responsibilities: • Responsible for signing of checklist covering all aspects of installation, Inspection, commissioning. • Commissioning of Air Handling Units, Fan Coil Units, Humidifiers, Exhaust Fan, Hot water System, etc • Planned Preventive Maintenance (PPM) of DDC. • Experience in Solar Power Plant installation and commissioning on Roof top and Ground Mount system. • Check site feasibility of roof and prepare the project report. • Perform inspection of solar plant as per approve checklist. • Having knowledge of EPC agreement and tender document. • Troubleshoot and diagnose issues. • Preparing daily workloads for staff & coordinating the daily allocation of work. • Preparation of Daily report of work inspected. • To coordinate with subcontractors & suppliers in order to replace worn-out or faulty equipment as required. • To resolve and rectify any kind of technical difficulties and other problems that may arise at any time in the system. • To identify issues, defects and generate a report on the corrective measure. • Support technical staff including external contractor to ensure all work is done in an effective and efficient manner. • Calibration and maintenance of field instruments like flow, level, pressure, Temperature and Humidity Transmitters Pressure switches, etc. • Experience in using various calibrators such as Fluke, Hart, etc. • Having Knowledge of troubleshooting field devices like valves, actuators, sensors, and thermostats. • Monitor Proper implementation of safety, Health, Environment with in site. • Attending Meetings with Client.