PLANT AND EQUIPMENT MANAGER

AVI DAS

AD-39 RABINDRAPALLY , KRISHNAPUR, KOLKATA-7000101(INDIA). Current -DRC
Connect
Shortlist

About Candidate

I think determination, dedication, &hard work can help to achieve one’s desired goals in life. I also can organize a program confidently with others even under pressure. I can be team leader if responsibility is entrusted to me. My outlook towards the various struggles & hardship in life is dedication & hard work does pay. Just working hard towards the goal & not bothering about the failures that may arise, for it has been rightly said that failure is pillar of success. The valuable keywords that inspire me to go ahead with my allotted task are the three D’s,which are “Determination, Dedication, and Diligence”.

Education

M
MATRICULATION -
WEST BENGAL BOARD OF SECONDARY EDUCATION

-

H
HIGHER SECONDARY -
WEST BENGAL BOARD OF HIGHER SECONDARY

-

D
DIPLOMA IN MECHANICAL ENGINEERING -
CALCUTTA ENGINEERING COLLEGE

-

Experiences

C
Concrete Batching plant Maintenance And Operation Manager 2023-11-15
EDILE CONSTRUCTION (DRC CONGO)

Job responsibilities : • Operation for Ready-mix • Weekly and monthly budget • Quality testing • Workshop Handling • Selecting tools and Materials • Preparing Site report • Maintaining quality control procedures • Finding ways to prevent problems from happening and solve any that crop up • Order raw materials

P
PLANT AND EQUIPMENT MANAGER 2022-01-01 - 2023-09-01
NYANZA ROAD WORKS LTD(TANZANIA)

Job responsibilities : • Operations Management – Management and coordination of all technical & financial activities of the Group and Managing, preparing, present monthly, quarterly and annual progress reports to the management, finance committee and board of directors. • Construction Planning – Preparing construction and procurement programmes, method statements, prelims, etc, for tenders forms of contracts. • Financial – Prepared & Controlled annual budgets, present profit and loss statements, quarterly profit forecasts, working capital requirements etc, project-wise and comprehensive. • Ready-mix Operation and quality Handling • site 180 people handling HANDELING EQUIPMENT • Batching Plant -CP 30, CP 18 , CP120 • Greaves- Concrete pump ,Batching plant . • Schwing Stette r- Batching plant , concrete pump. • Putzmeister - concrete pump. • Tower crane- Ace and Potain • Jcb- Loader , Backhoeloader. • Volvo,Daf,Benz,Scania, Astra , Eicher - Heavy Track & Dumper • B.E.M.L- Dozer ( 50 ,80). • Excavator , Motor Grader,Roller , Bitumen Distributor • Crusher 200 ton/Hrs

P
PLANT AND EQUIPMENT MANAGER 2015-04-20 - 2022-01-01
ELEGANT PROPERTIES LTD (KENYA)

Job responsibilities : • Operation for Ready-mix • 1200mm dia 28m long 1400nos piling project • Weekly and monthly budget • High-rise building all concrete works • Quality testing • Workshop Handling • All Machinery & Equipment Maintenance And Repair • Coordinating and Supervising Constructions works • Selecting tools and Materials • Checking And Preparing Site report • Maintaining quality control procedures • Finding ways to prevent problems from happening and solve any that crop up • Site and workshop (170+45)People Handling

A
Asst. Production Manager 2014-02-15 - 2015-02-01
Steel King , Yangon Concrete, Myanmar

Job responsibilities : • Maintains the highest standard of quality and safety in all areas of production from manufacturing to shipment • Safely batch concrete and load trucks according to order specification • Manages the schedule and performance of production maintenance • Ensures the plant maintains proper stock inventories(raw materials,machinery/vehicle parts,etc.) • Supervise hourly personnel &deivers to include:hiring,training,directing,counselling and disciplining employees according to company policy • Communicates with production Manager and other department • Performs month end inventory • Handling more then 100 people

P
Plant & Machinery Manager 2011-11-11 - 2014-01-01
Advent Construction Ltd (Tanzania)

Job responsibilities : • Manage all machinery and light duty vehicles • Formulation and implementation of equipment maintenance plan • Planning and delegation of duties to the workshop team • Managing breakdowns on site and workshop • Improving machinery availability and minimising down time • Overseeing Procurement of spares • Ensuring health and safety procedures and adhered to • All concrete Testing • Concrete Mix design Preparation • Before concrete checking Steel work And formwork • As per drawings calculated Steel weight and Qt. And order • Handling around 80 to 90 people

M
Mechanical Engineer 2009-08-01 - 2011-11-19
Premco Rail Engineers Ltd (India)

Job responsibilities : • Manage Heavy Earthmover machinery and light duty vehicles • Repair and Maintenance all Machinery • Preparation Maintenance schedule • Spare parts Procurement • Coordinated with Project Manager and H.O • All pileg work (Steel and concrete work) • Pile load test and radiographic test • Monthly budget • Coordinated with RDSO(Railway) engineers • Stations Building and Station Platform Concrete works • Handling Around 190 people

M
Mechanical Engineer(Trainee ) 2007-01-01 - 2009-01-01
Concrete India Ltd (Railway Sleeper )

Designation : • Job responsibilities : • Production Department: Mono block Sleeper casting , • Lab Deparment : Testing –Aggregates , water,Cement,Cubes , Beams ,Sleeper, Check HTS, Inspection OF Sleepers , Moisture Adjestment, steam curing temp. Monitor and adjustment Concrete mix design • Maintenance Department: Batching Plant , Overhead Crane

Skills

Mechanical & Electrical designing
90%
Batching Plant Erection and Maintenance
92%
Heavy Machinery Maintenance & Operation
94%
Project Management & Development
96%

Be the first to review “AVI DAS”